Preparation before operation
1.Check the equipment: confirm that all parts are in good condition without loosening or damage.
Clean the machine: remove debris from the machine.
2. Start the machine
Connect power (motor type): place the power switch in the ON position.
Preheat: let the machine run at a low speed for 1-2 minutes after starting, and then increase the speed after preheating.
3. Strip operation
-Uniform feeding: feed the crops evenly into the feed inlet to avoid blockage.
-Adjust the parameters: adjust the threshing clearance and rotation speed according to the situation of the rice.
-Monitor operation: pay attention to the running state of the machine and immediately for inspection.
4. Downtime
-Stop feeding: stop feeding the rice after the operation.
-Empty dle cleaning: let the machine idle for 1-2 minutes to remove residues.
-Power off: Place the power switch in the "OFF" position (motor type).